Factory Tour

Walk our Shenzhen kitchen appliance factory

15,000 m² workshop, 5 production lines and 62 machines — moulding, injection, assembly, testing and loading under one roof.

Request a quotationBook a live video tour

  • 13+ years
  • 15,000 m²
  • 5 production lines
  • 62 machines
  • CE · CB · ETL · FCC
15,000 m²Workshop area
5Production lines
62Machines on site
~300Staff
13+Years in appliances

Walk the production floor

Nine stations, from raw material intake to container loading.

Raw material warehouse at YLD HOME factory
Raw material warehouse
Mould workshop at YLD HOME factory
Mould workshop
CNC machining at YLD HOME factory
CNC machining
Injection workshop at YLD HOME factory
Injection workshop
Electronic workshop at YLD HOME factory
Electronic workshop
Assembly workshop at YLD HOME factory
Assembly workshop
QA and QC test lab at YLD HOME factory
QA and QC test lab
R&D laboratory at YLD HOME factory
R&D laboratory
Loading and shipping at YLD HOME factory
Loading and shipping

How a container order runs

Six steps from first brief to loaded container.

1
Brief

Market, volume, target price and branding

2
Sampling

5–7 day samples, refunded against the order

3
Tooling and artwork

Colour, logo, rating label and carton proof

4
Mass production

25–35 days after deposit

5
Inspection

OQC report, third-party inspection on request

6
Loading

Container plan, loading photos and shipping documents

Book a live video factory tour

Short clips from our own production lines. Ask for a live walkthrough on your meeting platform.

Factory tour FAQs

Can we visit the YLD HOME factory in person?

Yes. YLD HOME welcomes buyer visits to the Shenzhen workshop. Send your travel dates through the quote form and YLD will arrange an agenda covering the production lines, injection workshop, quality control lab, samples and a technical meeting.

What can we see during a live video tour?

A live video tour covers the mass production lines, assembly cells, quality control lab and finished goods warehouse. YLD can also show the specific model you are evaluating while it runs, on request.

How large is the factory and how many lines does it run?

The YLD HOME workshop covers 15,000 m² and runs 5 production lines with 62 machines and around 300 staff, including in-house mould, injection, electronics and testing teams.

Are third-party audits accepted?

Yes. YLD HOME supports BSCI, Sedex and buyer-appointed audits, and can share previous audit reports and test documentation for the models you are considering.

Can you produce our own model under our brand?

OEM and ODM programmes are open from the first order. YLD handles tooling, electronics, packaging artwork and manual translation, and produces under your brand with your own model numbering.

What is the minimum order for a factory-direct programme?

MOQ starts at 100 units per model for stock platforms, rising to 1,000 units where custom tooling, logo and packaging are required. YLD quotes FOB Shenzhen with CIF and DDP on request.

Download inspection reports

Independent pre-shipment inspections on bulk production – two recent examples that passed:

Read how the process works on the quality control page.

Buyers who visited us

Importers, distributors and own-brand buyers visit the YLD Home factory and showroom every month to test hand blenders and hand mixers before ordering. A visit usually covers the showroom range, hands-on testing, the production floor and a commercial discussion on MOQ, samples and lead time.

Overseas buyer visiting YLD Home kitchen appliance factory in Shenzhen
Buyer reception visit
Buyer testing hand blenders at YLD Home factory visit
Hand blender sample trial
Hand mixer sample trial during a YLD Home buyer visit
Hand mixer sample trial
Business meeting with a visiting kitchen appliance buyer
Sales meeting with a visiting buyer

See more photos and what a visit includes on the customer visits page.

Ready to price your next container?

Send YLD HOME your market, target volume and branding requirement for an FOB Shenzhen quotation, sample plan and container loading proposal.

Reply within one working day · MOQ 100 units · FOB Shenzhen

Scroll to Top
YLD-Home Logo

Product Inquiry

Scan the code